Permits When do I need
a building permit? How do I get one? A permit is needed if you plan to alter a building by cutting a portion of a wall, removing or cutting any structural beam or load bearing support, or change any required means of entering or exiting. In accordance with the State of Connecticut Basic Building Code and the West Hartford Zoning Ordinance, permits are also required for air conditioning, heating, sprinkler, electric wiring, and plumbing. Building and Zoning permits must comply with current Zoning Codes, where applicable. All building department permit fees are $32.22 for the first $1,000 of estimated market value cost and $17.22 for each additional $1,000 (as of July 1, 2009). When you calculate the estimated cost for a general building permit application do not include electrical, plumbing, heating, air conditioning or sprinkler costs, since each of those require a separate permit and permit fee. Click here for our convenient Fee Schedule chart. How long does it
take to get a building permit? Why are building
permits required? For more information, visit the Permits & Applications web page. |
||||||||||||
| ©2000 Town of West Hartford. Designed by The Computer Company, Inc | |||||||||||||